UV and Filter Installation
Published on Mar 31, 2015
 

UV and Filter Installation

Tadpole with SMART UV Installation The diagram shows the correct Tadpole Filter and SMART UV operating locations. For additional circulation inside the pond, increase the pump size by 50% and create a by-pass using a “Tee” and “Ball Valve” manifold. Use the additional flow capacity from the by-pass to increase circulation. Be sure not to exceed the SMART UV’s flow rate.

TadpoleUV Installation The TadpoleUV does not require plumbing or external space. It does, however, require two outdoor-rated electrical receptacles.